Logo

Clepington Road

Clepington Road

Dundee City Council recognises that it is essential that everyone can charge their vehicle easily and is now one step closer to realising that goal with the new rapid charging hub at Clepington Road, which was carefully designed with accessibility in mind before it opened in April 2023. The two-year design process involved engaging with smart and sustainable cities consultancy, Urban Foresight, as well as drivers with a disability, charities, and manufacturers.
 
The charging hub on Clepington Road, also known as the Fourth Hub or the Charging Oasis, comprises five 50kW rapid chargers and a single 150kW ultra-rapid charger, which provide nine parking bays. On the site, drivers with disabilities will find solutions designed to accommodate their needs. Revisions were made to both the design of charge points and to the physical environment surrounding them. 

The rapid charging hub at Clepington Road features the following combination of various solutions that accommodate easier charging:

  • All bays are an accessible size of 3.6m wide and 6m long, allowing space around the vehicle for wheelchairs 
  • Unobstructed routes around the charge points and level access across the site 
  • No pavements preventing access to charge points 
  • Charge points are not located on raised plinths 
  • Removal of bollards from around charge points 
  • The use of colour-contrasting wheel stops in the bay to prevent vehicles from encroaching on the charge points 
  • Longer cables 
  • Cable retention systems take some of the weight of the cables and remove trip hazard of cables on the ground 
  • Well-lit site in an area with high levels of footfall.

For Dundee City Council, these major advancements will begin improving accessibility across more sites. Our ambition is to continue to develop more accessible charging infrastructure with various partners and set the standards for accessibility and inclusivity across the country.

 

A state-of-the-art water filtration system

Besides the accessibility element, the site also offers a rest stop with a drinking water station. This pioneering installation manufactured by Bluewater provides free and purified drinking water for all users. It incorporates a fully integrated rainwater harvesting system to collect rainwater from the solar canopy at the hub and store it in a 5000-litre underground storage tank. The collected rainwater undergoes a range of advanced purification technologies before it is dispensed.

In doing this, we not only limit CO2 emissions, but also help build greater resilience and reduce the demand on the municipality’s water supply. The new Bluewater dispensers – equipped with 55” TV screens for multimedia messaging about topics including sustainability and hydration – provide free purified and chilled drinking water, representing a major step by Dundee to reduce consumption of single-use plastic bottled beverages. EV drivers using the new Clepington Road hub will now be able to fill their own refillable bottles with free purified drinking water on site.

Read more about Bluewater's rainwater harvesting system here - https://www.drivedundeeelectric.co.uk/news/2023/03/13/rainwater-harvesting-coming-to-clepington-road

 


 

Contact Us

To comply with data protection regulations (2018), we are unable to store and use your information unless you give us your permission. Please select Yes to allow this. View our data protection policy for details.